Gantt, AL Political Map | Democrat & Republican Areas in Gantt

Gantt is a Republican stronghold. About 8% of voters here vote Democratic and 92% Republican.

 
Gantt, AL block-group political-lean map
Click the map to explore
D+100 D+50 Even R+50 R+100
More liberal More conservative

About 70% of adults in Gantt typically vote, above the U.S. average of about 62%. Among adults in Gantt, ~5% vote Democratic, ~65% Republican, and ~30% don't vote. The map below shows estimated turnout by block group.

Gantt, AL block-group voter-turnout map
Click the map to explore
0% 50% 100%
Lower turnout Higher turnout
Colorblind friendly off

How Gantt compares

Among cities within 25 miles, Gantt leans more Republican than 38 of 47 neighbors.

Gantt runs about 53 points more Republican than Alabama as a whole.

Why Gantt leans the way it does

Density, race composition, education, and family structure all sit close to their national averages in Gantt. The lean here lands roughly where demographic data alone would predict.

Walkability and Republican lean

Places with a low walkability score tend to lean Republican; Gantt, AL sits in the bottom tenth nationally on this measure. A walkable street grid does not change how people vote; it mostly reflects how urban a place is.

Why turnout in Gantt looks the way it does

Turnout in Gantt sits close to the national pattern. Learn more about the findings and methodology on the political spectrum map.

Cities with Similar Populations

Sources and methodology

Precinct-level voting records used to fit the model come from Alabama Secretary of State, Elections, distributed by the Voting and Election Science Team. Demographic inputs come from the U.S. Census Bureau (ACS 5-year estimates and the 2020 Decennial Census). Health and environmental inputs come from the CDC (PLACES and the Environmental Justice Index). Land cover comes from the USGS and EPA. Election-day and lead-up weather come from PRISM 4km daily grids and the NOAA Global Historical Climatology Network. Mail-voting and election-administration patterns come from the MIT Election Lab's Survey of the Performance of American Elections. Block-group crime detail comes from CrimeGrade. Internet data and modeling support provided by ISPreports.org.

Modeling and analysis by the BestNeighborhood data science team. Full methodology and findings: political spectrum map.

Methodology reviewed by the BestNeighborhood data science team. Last updated November 2026.