Gantt, SC Political Map | Democrat & Republican Areas in Gantt

Gantt leans heavily Democratic by roughly 44 points: about 72% of voters vote Democratic and 28% Republican.

 
Gantt, SC block-group political-lean map
Click the map to explore
D+100 D+50 Even R+50 R+100
More liberal More conservative

About 61% of adults in Gantt typically vote, near the U.S. average of about 62%. Among adults in Gantt, ~44% vote Democratic, ~17% Republican, and ~39% don't vote. The map below shows estimated turnout by block group.

Gantt, SC block-group voter-turnout map
Click the map to explore
0% 50% 100%
Lower turnout Higher turnout
Colorblind friendly off

How Gantt compares

Among cities within 25 miles, Gantt is the most Democratic-leaning.

Gantt runs about 61 points more Democratic than South Carolina as a whole. South Carolina leans Republican overall, while Gantt is one of the few Democratic-leaning pockets.

Politics vary noticeably by neighborhood within Gantt. The east side runs the most Democratic (D+73) and the northwest side runs the most Republican (R+10), a spread of about 83 points.

Why Gantt leans the way it does

This analysis examined 14,881 data points per city to find what predicts political lean and turnout. The items below are a few correlations that stood out for Gantt, not a ranked or complete list of what matters most.

Dense areas vote Democratic. About 87% of residents in Gantt live in densely developed areas, about 51 points above the U.S. average of 36%. A high never-married share predicts Democratic voting, and about 40% of adults in Gantt have never been married, above 94% of cities. Gantt runs against the grain of South Carolina, a Democratic-leaning pocket in a Republican-leaning state.

Population density and Democratic lean

Places with high population density tend to lean Democratic; Gantt, SC sits in the top tenth nationally on this measure.

Why turnout in Gantt looks the way it does

Areas with limited routine healthcare access turn out at lower rates. Gantt is in the bottom quarter nationally for routine-care measures such as insurance coverage, preventive screenings, and dental visits. The dental-visit rate here is about 49%, about 9 points below the South Carolina average of 58%. Renters vote less often than owners, and about 40% of households in Gantt rent, above 94% of cities. High food insecurity lines up with lower turnout, and about 33% of adults in Gantt report food insecurity, above 97% of cities. Learn more about the findings and methodology on the political spectrum map.

Cities with Similar Populations

Sources and methodology

Precinct-level voting records used to fit the model come from South Carolina State Election Commission, distributed by the Voting and Election Science Team. Demographic inputs come from the U.S. Census Bureau (ACS 5-year estimates and the 2020 Decennial Census). Health and environmental inputs come from the CDC (PLACES and the Environmental Justice Index). Land cover comes from the USGS and EPA. Election-day and lead-up weather come from PRISM 4km daily grids and the NOAA Global Historical Climatology Network. Mail-voting and election-administration patterns come from the MIT Election Lab's Survey of the Performance of American Elections. Block-group crime detail comes from CrimeGrade. Internet data and modeling support provided by ISPreports.org.

Modeling and analysis by the BestNeighborhood data science team. Full methodology and findings: political spectrum map.

Methodology reviewed by the BestNeighborhood data science team. Last updated November 2026.